Power station

Our Powe station is a transportable compact shelter, suitable for secondary distribution grid with ring configuration and remotely controlled. The short assembly and construction phases in the factory allow a quick installation on site.

OIL TRANSFORMER – SKID SOLUTION

The skid solution is a prefabricated plug-in compact substation, designed to elevate energy from PV plants to elevating substations.
It is equipped with power distribution components:

  • Medium voltage switchgear - up to 40.5 kV
  • Oil-type transformer - up to 10000kVA
  • Low voltage switchboard
  • Automation system for the control and supervision
  • Inverter, bus duct, auxiliary equipment

DRY-TYPE TRANSFORMER – KIOSK SOLUTION

The Kiosk solution is a prefabricated plug-in compact substation, equipped with power distribution components:

  • Medium voltage switchgear - up to 40.5 kV
  • Dry-type transformer - up to 5000kVA
  • Low voltage switchboard
  • Automation system for the control and supervision
  • Inverter, bus duct, auxiliary equipment

Technical features
  • It can be supplied as a centralized inverter or as a string inverter, for large photovoltaic plants.

  • Transportation methods: It can be lifted from lifting brackets and placed by a crane on the concrete foundation.

  • Alternatively, it can be dragged by a tractor. Dragging is done by attaching the steel holding lines with hooks to the ends of the cabin, where the anchoring points are.

Advantages
  • Plug & play

  • Floating PV plant

  • Customized internal configurations

  • Compact and small size structure

  • Suitable for road and sea transportation

  • Short installation times

  • Resistant to elements and hostile environmental conditions

Applications
  • Utility on primary and secondary distribution grids

  • Photovoltaic plants

  • Battery storage

  • Wind power stations

  • Suitable for floating applications

Related projects to Power station

eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB

Calcinate (Italy)

Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.