Supply of Electrical Materials for a Photovoltaic Plant

Areza (Eritrea)

Country

Eritrea

Year

2018

Location
Products
Description

The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.

It has been installed:

  • 13 voltage transformers 200kVA 15000/400/240V;
  • 21 voltage transformers 100kVA 15000/415/240V;
  • 26 voltage transformers 50kVA 15000/415/240V;
  • 30 voltage transformers 25kVA 15000/415/240V.
In addition, the project has included over n. 6000 circuit breakers, n. 170 disconnectors and various types of cables and connectors. The n. 2 viallges in Aresa and Maidma have been interconnected to n. 2 photovoltaic plants of total power 2.7MWp.

Related projects

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.

IP65 SWITCHGEAR FOR PERU

Yauyos (Peru)

We have designed, carried out and supplied a medium-voltage (MV) Normal Clad switchgear 24kV 630A 31.5kA in box IP65, with a withdrawable circuit-breaker, addressed to a mining plant in Peru.