Supply of Electrical Materials for a Photovoltaic Plant

Areza (Eritrea)

Country

Eritrea

Year

2018

Location
Products
Description

The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.

It has been installed:

  • 13 voltage transformers 200kVA 15000/400/240V;
  • 21 voltage transformers 100kVA 15000/415/240V;
  • 26 voltage transformers 50kVA 15000/415/240V;
  • 30 voltage transformers 25kVA 15000/415/240V.
In addition, the project has included over n. 6000 circuit breakers, n. 170 disconnectors and various types of cables and connectors. The n. 2 viallges in Aresa and Maidma have been interconnected to n. 2 photovoltaic plants of total power 2.7MWp.

Related projects

N. 6 Photovoltaic Plants for a total power of 10MW

Havana, Pinar del Rio, Isla de la Juventud, Cienfuegos, Guantanamo (Cuba)

It is the first major project concerning 6 photovoltaic plants distributed in five different Cuban provinces, which has the function of reducing CO2 emissions and safeguarding the surrounding environment, threatened by the increasing rate of tourism.

N.7 Photovoltaic Plants for a total Power of 15 MW

Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba, Guantanamo (Cuba)

The project, which has allowed to produce energy locally, has included n. 7 photovoltaic plants located in 5 different Cuban provinces: Granma, Pinar del Rio, Ciego da Avila, Santiago de Cuba and Guantanamo.