Supply of Electrical Materials for a Photovoltaic Plant
Areza (Eritrea)
Country
Year
Description
The project has been implemented in Areza, a rural area in the south of Eritrea, aimed to supply electrical material for a photovoltaic plant.
It has been installed:
- 13 voltage transformers 200kVA 15000/400/240V;
- 21 voltage transformers 100kVA 15000/415/240V;
- 26 voltage transformers 50kVA 15000/415/240V;
- 30 voltage transformers 25kVA 15000/415/240V.
Related projects
Medium-Voltage Switchgears (MV) ATR-ring 36kV 630A 16kA
Artemisa (Cuba)
The project has been carried out in Artemisa, an important industrial center in Cuba.
N. 2 Transformation cabins for industrial areas
Artemisa (Cuba)
Design, construction, installation of n. 2 STC-Kiosk transformation centers with ring configuration addressed to industrial areas in Cuba.