Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

MV E-House 35/20/10kV for industrial district

Peshkopi (Dibër) - Albania

Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.

MV Transformation cabin 30kV for electrical grid

Halat (Lebanon)

The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.