Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

STC-SKID transformation cabins 6MVA et 4MVA

Bucharest (Romania)

Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.

N. 2 Transformation cabins and n. 2 switching stations for PV greenhouses

Oristano (Italy)

The project includes the design, manufacturing, and supply of n. 2 Transformation Cabins STC-Box and n. 2 Delivery Cabins for two photovoltaic greenhouse plants, in Oristano (Sardinia).