Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
Connection substations 30/220kV for Sicily
Gibellina (Italy)
Design, manufacturing and supply of n. 3 switchrooms for Gallitello connection substation 30/220kV in Gibellina area. It is an essential element for trengthening the region’s energy resilience and integrating renewable energy sources into the Sicilian national transmission grid.
eHouse substation for food packaging factory
Carribean Islands
Plug-in compact substation, a fully integrated and versatile solution designed for maximum efficiency and reliability, destined to a food packaging factory, designed for Latin America.