Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
CIRCULAR-ECONOMY PROJECT IN SYRIA
Damasco (Syria)
Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.
Powering the king: eHouses for project Mufasa
Vlissingen
We have designed, manufactured and supplied n. 5 eHouses for the Battery Energy Storage System (BESS) in Vlissingen, a key hub for renewable energy in the Netherlands.
The great project, called Mufasa, is one of the BESS plant largest ever built in Europe and will replace a former coal-fired power plant connection to the high-voltage grid.