Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
Medium-Voltage (MV) Normal Clad Switchgears 7,2kV 630A 20kA (3s)
Donetsk (Ukraine)
The project has involved the implementation of Normal Clad switchgears, addressed to an important industrial, steel and chemical hub in the city of Donetsk.
Normal Clad switchgear for electrical power grid
Latin America
Design, manufacturing and supply of n. 24 MV AIS Normal Clad cubicles 13.8kV 2500A 25kA equipped with our wireless and battey-less PR.E.SE. (PRedictive Electrical SEnsors), Power transformers 110kV/34,5kV 28/40MVA with ONAN/ONAF, Power Transformer Protection panel, and customized SCADA system.