Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

N. 4 MV E-Houses 23kV for electrification of rural areas

Gonaives e Cabo Haitiano (Haiti)

The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.

Medium-Voltage (MV) ATR Switchgears 36kV 630A 12,5kVA

Addis Ababa (Ethiopia)

The project has been carried out in Addis Abeba and consists of engineering, construction and supply of n. 2 medium-voltage ATR switchgear cubicles 36kV 630A 12,5kVA for industrial applications.