Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

Medium-Voltage (MV) Switchgears 24kV 2000A 16kA for Photovoltaic plants

Montalto di Castro (Italy)

The project was carried out in Montalto di Castro, in Viterbo, a well-known location as one of the largest solar photovoltaic plant in Italy.

MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT

Arlena di Castro (Italy)

Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.