Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
EHOUSE 36kV 42MW BESS PLANT
Hyde (United Kingdom)
We have delivered our eHouse, STC-Box 33kV type, addressed to a Battery Energy Storage System, located in Hyde (UK).
eHouse 33kV for BESS in Lancashire
Chorley (United Kingdom)
Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.