Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

N. 4 switching station and n. 1 control room for BESS

Cernay-lès-Reims (France)

Installation will feature 240MW/480MWh of storage capacity and will be connected to the 225kV RTE national grid.

Protection panels for Electrical Substation

Croydon (United Kingdom)

The project, carried out in the city of Croydon, a metropolitan center located in south of London, has included the supply of two protection and control panels, the materials and accessories needed for the putting into service. Everything was addressed to an electrical substation 34.5kV 24Vdc with a frequency of 60Hz.