Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
N. 4 TRANSFORMATION CABINS FOR PHOTOVOLTAIC SYSTEM 3.15MVA
Viterbo (Italy)
Design, manufacturing and supply of nr. 4 modular and plug-in Solar Stations, STC-Kiosk, for the photovoltaic system in Viterbo, Italy.
Medium-Voltage (MV) Normal Clad Switchgears 7,2kV 630A 20kA (3s)
Donetsk (Ukraine)
The project has involved the implementation of Normal Clad switchgears, addressed to an important industrial, steel and chemical hub in the city of Donetsk.
