Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
eHouse for BESS in Lincolnshire
Lincolnshire (Regno Unito)
Project designed to improve the energy infrastructure in the UK: supply of a fully equipped 33kV switchroom STC-Box for a Battery Energy Storage System (BESS) located in Grimsby, Lincolnshire.
EHOUSE 33KV FOR BESS IN BELGIUM
Wallonia (Belgium)
We have designed, manufactured and supplied an eHouse, equipped with our air-insulated MV ATR switchgear 36kV 1250A 25kA (1s), patch panel, SCADA system, UPS, LV switchgear, HVAC system, fire detection system and Roxtech multi cable transit.