Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

Normal Clad switchgears 24kV IP65 for Mine

Yauyos (Perù)

The project has the aim to increase the electrical grid of a mine located in the province of Yauyos (Peru) and it has involved the design, construction and supply of n. 7 medium-voltage (MV) Normal Clad switchgear cubicles 24kV 630A 31.5kA and 17.5kV 1250A 31.5kA, with IP65 protection degree, an auxiliary transformer 12600/230V 10kA, materials and accessories necessary for the start-up of the plant.

Agrivoltaic: Energy and agriculture in synergy

Montalto di Castro (Viterbo)

Switchroom eHouse designed and manufactured for the Guinza Grande plant in Montalto di Castro, Viterbo.