Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
MV E-HOUSE 33kV 20MVA FOR BESS
Surrey (United Kingdom)
Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).
MV E-House 4.16kV for oil plant
Nafoora (Lybia)
The project includes the design, construction, and commissioning of a compact and modular substation STC-Box and it is addressed to an oil plant in Nafoora, Sirte Bay, in Lybia.