The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

N. 2 HV/MV Mobile Substations 110/33kV 16MVA

Basra (Iraq)

These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.

Medium-Voltage (MV) Normal Clad Switchgears IP65 40,5kV 630A 16kA (3s)

Chihuahua (Mexico)