Supply of electrical equipment

Porto Alegre (Brasile)

Country

Brazil

Year

2015

Location
Products
Description

The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.

N. 2 HV/MV Mobile Substations 110/33kV 16MVA

Basra (Iraq)

These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.