Supply of electrical equipment
Porto Alegre (Brasile)
Country
Year
Description
The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.
The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.
Related projects
Medium-Voltage (MV) Normal Clad Switchgears 36kV and 12kV 2500-4000A 40kA (3s)
Basra (Iraq)
Design, construction and start-up of medium-voltage switchgears for the primary distribution aimed to increase the electrification of the Iraqi national grid, in order to guarantee high-reliability and continuity of service.
Photovoltaic plant 25MWp and GIS substation 60kV
Caraculo (Angola)
Design, construction, supply of the electrical equipment for a photovoltaic plant 25MWp and 60kV GIS substation in Angola.