The project, carried out in Porto Alegre in Brazil, has involved the supply of materials and accessories for the assembly of switchgears and electrical equipment.

The project has included overloaded disconnectors 36kV together with the accessories and auxiliary materials needed for the start-up of a plant.

Related projects

eHouse for Continosa PV and wind plant 90MVA

Macchiareddu (Italy)

Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).

CIRCULAR-ECONOMY PROJECT IN SYRIA

Damasco (Syria)

Fast-track project of n. 2 ATR electrical switchgears (n. 11 cubicles), aimed to the restart of an important steel plant in Syria.