Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.
The compact substations are designed as follow:
- N. 2 STC-Skid 6MVA/2MV 20kV
- N. 1 STC-Skid 4MVA/2MV 20kV
By integrating these Skid Cabins into the photovoltaic system, we are truly connecting the power and driving forward the green energy development.