MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
Country
Year
Description
Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.
The plug & play solution, intended as the supply of a complete and ready-to-use system, guarantees high efficiency and, at the same time, quick installation. Each STC-Box compact substation is equipped with:
- Medium-voltage (MV), gas-insulated (GIS) ATR-Ring switchgear (15 cells) 36kV 630A 16kA
- Transformers
- Inverter
- Euro-SDS and Euro-P&C low-voltage panels (LV)
- SCADA system for the control, supervision and automation of the plant
- Lighting and air-conditioning systems
- Auxiliary equipment
The compact substations, in consideration of the climatic and environmental conditions of the place of destination, are made of material resistant to humidity and salinity. Listening to the customer's needs means providing a quality solution, functional to its final application and destined to last over time.
Related projects to eHouse
MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT
Arlena di Castro (Italy)
Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.