MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
Country
Year
Description
Designed, construction and supply of n. 2 modular, pre-assembled and fully tested STC-Box cabins, for the expansion of a power plant serving the industrial area of Artemisa, in Cuba.
The plug & play solution, intended as the supply of a complete and ready-to-use system, guarantees high efficiency and, at the same time, quick installation. Each STC-Box compact substation is equipped with:
- Medium-voltage (MV), gas-insulated (GIS) ATR-Ring switchgear (15 cells) 36kV 630A 16kA
- Transformers
- Inverter
- Euro-SDS and Euro-P&C low-voltage panels (LV)
- SCADA system for the control, supervision and automation of the plant
- Lighting and air-conditioning systems
- Auxiliary equipment
The compact substations, in consideration of the climatic and environmental conditions of the place of destination, are made of material resistant to humidity and salinity. Listening to the customer's needs means providing a quality solution, functional to its final application and destined to last over time.
Related projects to eHouse
N. 2 MV E-Houses for the most powerful turbine in Europe
Marghera Levante (Italy)
The challenging project has included the design, construction, and commissioning of n. 2 e-Houses for the port area of Marghera Levante (Venice).
MV E-House 36kV for Artemisa development area
Artemisa (Cuba)
The Distribudora III project is addressed to an industrial district in Artemisa, in Cuba, and it is part of a collaboration work started in 2015.