MV E-House 35/20/10kV for industrial district

Peshkopi (Dibër) - Albania

Country

Albania

Year

2014

Description

Design, construction and supply of a medium-voltage (MV) compact substation in Peshkopi, industrial area of the Albanian city Dibër.

The project has involved the design and implementation of a compact substation STC-Box 35/20/10kV, which includes medium-voltage metal-enclosed ATR switchgears 12kV, 24kV and 39kV, an auxiliary transformer, a low-voltage (LV) switchgear 400V 160A 10kA, power transformer 12MVA 35/20/10kV, DC system, earthing system and auxiliary services.

Related projects to eHouse

MV E-House 34.5kV for industial district

Artemisa (Cuba)

The project, carried out in the industrial district called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution STC-Box shelters.

The largest Rooftop Photovoltaic Plant in Cuba

Artemisa (Cuba)

The project has included the installation of four photovoltaic plants set on the roofs of four different warehouses.