Extension of 110kV and 36kV High-Voltage (HV) Substations
Artemisa (Cuba)
Country
Year
Description
Supply of equipment and spare parts for electrical substations in the industrial developing area located at about 30 kilometers from the capital.
Extension of the previously realized 110kV and 36kV electrical substations. The project has included circuit-breakers, auxiliary relays, current transformers and power transformers.
Related projects
Medium-Voltage (MV) Transformers 34,5kV 2000kVA
Artemisa (Cuba)
The project has included the supply of a medium-voltage transformer 34,5kV 2000kVA.
Retrofit of MV Circuit-breakers 1250A / 2500A / 4000A
Best (Holland)
The retrofit project of medium-voltage (MV) circuit-breakers was addressed to n. 12 primary distribution plants and run by one of the leading companies in the electricity distribution field in the south of the Netherlands.