Retrofit of the Busduct in a Thermoelectric Power Plant

Matanzas (Cuba)

Country

Cuba

Year

2018

Description

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for a thermoelectric power plant.

Realization of an aluminum cylindrical busduct, protected by a covering that connects the generator to the power transformer.

Related projects to Electrical substation

MV/MV Substation 34.5/13.8kV 6.3MVA

Pesquero (Cuba)

Design, construction and installation of electrical equipment destined for the revamping and empowerment of an outdoor electrical substation MV/MV 34.5/13.8kV serving a tourist center located in the province of Holguín (Cuba).

HV Substation 132kV

Adria, Loc. Smergoncino (Italy)

The project, result of an important partnership, is addressed to a historical industrial company located in Smergoncino, in Rovigo area. The long-lasting know-how gained in the high-voltage field has made it possible to increase the plant power supply.