Description

The project has been carried out in record time in the Cuban city of Matanzas and has included design, installation and supply of the busduct and its auxiliary transformer for a thermoelectric power plant.

Realization of an aluminum cylindrical busduct, protected by a covering that connects the generator to the power transformer.

Related projects to Electrical substation

MV Substation 24kV

Vedado (Cuba)

Design, construction and supply of electrical equipment destined for the new 5-star hotel "Torre K" in Vedado, in Havana.

N.2 HV/MV Substations 110/7.3kV 8MVA

Çemericë, Korçë (Albania)

The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.