PHOTOVOLTAIC SYSTEM FOR COFFEE ROASTERY

Artemisa (Cuba)

Country

Cuba

Year

2020

Description

Design, construction, and commissioning of a rooftop photovoltaic system (PV) 168kWp including n. 594 solar panels 280kWp, n. 3 inverters 50kW, and low-voltage (LV) switchboards Euro-SDS 415/240V 60Hz, for the energy supply of a big coffee roastery, which has a production capacity of 1200 kg/h of ground and roasted Cuban coffee.

The project was carried out in the industrial developing center in Artemisa, where our company has already carried out other important projects, in collaboration with well-known companies. In line with government policies, aimed at reducing dependence on fossil fuels, the developing strategy of this area is based on a sustainable plan and especially the use of renewable sources for electricity generation.

Related projects to Photovoltaics

Skid transformation cabin 36kV 4.4MVA

Trino Vercellese (Italy)

We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.

N. 4 Transformation cabins for photovoltaic systems 3.15MW

Pontinia and Montalto (Italy)

Design, construction and commissioning of plug-in compact substations STC-Kiosk for 3.15MW photovoltaic systems in Pontinia and Montalto (Latina).