Description
The medium-voltage switchgears allow to increase the supply of electrical energy produced by the substations of Cayo Coco y Guillermo, which are part of a project previously carried out.
The project has included the implementation of five Normal Clad Duplex switchgears 13,8kV 1250A 25kA (1s), equipped with control panel, alarm and remote measurement system.
Related projects
Protection panels for Electrical Substation
Croydon (United Kingdom)
The project, carried out in the city of Croydon, a metropolitan center located in south of London, has included the supply of two protection and control panels, the materials and accessories needed for the putting into service. Everything was addressed to an electrical substation 34.5kV 24Vdc with a frequency of 60Hz.
N. 2 Transformation cabin 34.5kV
Jardines del Rey (Cuba)
Design, supply and implementation of the n. 2 compact substations 34,5kV in the Jardines del Rey area, located in Camagüey.