N. 4 Power Transformers 40.7MVA in total
Tiranë (Albania)
Country
Year
Location
Description
The project has been carried out in Albania, in collaboration with the local company OSHEE.
The project has included n. 4 transformers with the following characteristics:
- 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
- 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
- 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
- 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
Related projects
MV E-House 34.5kV for oil plant
Sirte Bay (Libya)
Extension of the electrical substation serving the oil plant in Nafoora, at Sirte Bay. The project involves the design, construction, and supply of 34.5kV, 4.16kV and 480V compact and modular plug-in substations.
MV eHouse 33KV for battery energy storage system 100MW
Pillswood (United Kingdom)
The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.