N. 4 Power Transformers 40.7MVA in total
Tiranë (Albania)
Country
Year
Location
Description
The project has been carried out in Albania, in collaboration with the local company OSHEE.
The project has included n. 4 transformers with the following characteristics:
- 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
- 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
- 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
- 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
Related projects
MV E-House 20kV for photovoltaic plant
Cipollaretta (Italy)
Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.
eHouse for Continosa PV and wind plant 90MVA
Macchiareddu (Italy)
Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).