N. 4 Power Transformers 40.7MVA in total

Tiranë (Albania)

Country

Albania

Year

2016

Location
Description

The project has been carried out in Albania, in collaboration with the local company OSHEE.

The project has included n. 4 transformers with the following characteristics:

  • 20/25 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 6.3 kV
  • 10 MVA transformer immersed in three-phase liquid, 115 ± 2x2.5% / 38.5 ± 2x2.5%/10.5 kV
  • 7.5 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 10.5 kV
  • 10 MVA transformer immersed in three-phase liquid, 35 ± 2x2.5% / 6.3 kV
in order to increase the power of electrical substations

Related projects

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.

eHouse for Continosa PV and wind plant 90MVA

Macchiareddu (Italy)

Design, manufacture, and supply of our eHouse, the Switching Station STC-Box for the in the Continosa photovoltaic (PV) and wind park 90MVA, within the industrial area of Macchiareddu (Sardinia).