N. 5 substations 13.8kV and 34.5kV 54.8MVA

Jardines del Rey (Cuba)

Description

The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.

Location: Jardines del Rey north
Electrical substation 2 x 16/20MVA, equipped with n. 16 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA

Location: Bautista
Electrical substation 2 x 2.5MVA, equipped with n. 8 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA and n. 10 medium-voltage cubicles 34.5kV 1250A 25kA

Location: Jardines del Rey
Electrical substation 2 x 6.3MVA, equipped with n. 4 medium-voltage Normal Clad cubicles 13.8kV 1250A 25kA and n. 23 medium-voltage cubicles 34.5kV 1250A 25kA

Location: Port area
Electrical substation 2 x 6.3MVA, equipped with n. 15 medium-voltage metal-clad cubicles 34.5kV 1250A 25kA

Location: Airport
Electrical substation 2 x 6.3MVA, equipped with n. 12 medium-voltage metal-clad cubicles 34.5kV 1250A 25kA

Moreover, each substation includes:

  • Power transformers
  • Protection relays
  • LV panels EuroP&C for the monitoring and automation of the plant
  • LV panels Euro SDS
  • SCADA system
  • HVAC system
  • Internal lighting
  • Reactors for compensating long underground MV lines

Related projects to Electrical substation

MV Substation 13.8kV

Cayo Santa Maria (Cuba)

Design, construction and commissioning of a medium-voltage (MV) indoor electrical substation 13,8kV 2000A 25kA containing n. 22 air-insulated (AIS) medium-voltage (MV) Normal Clad switchgear cubicles, a low-voltage (LV) switchboard Euro-SDS 380/220V 60Hz, SCADA system for the control of the plant.

N.2 HV/MV Substations 110/7.3kV 8MVA

Çemericë, Korçë (Albania)

The project has seen the implementation of 2 high-voltage to medium-voltage electrical substations in Çemericë and Korçë.