N. 4 MV E-Houses 34.5kV for industrial area

Havana (Cuba)

Description

The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.

In details, it has involved n. 4 pre-assembled and modular compact substations STC-Box, containing n. 4 SCADA systems for the plant control, supervision, and data acquisition, gas-insulated (GIS) medium-voltage (MV) switchgears ATR-Ring 34.5kV 16kA 630A, Low-voltage switchboards RTU and Euro SDS for the control and supervision of the plant, power transformers, and interconnection cables.
Moreover, in order to address the energy supply, the STC-Box electrical substations are connected to:

  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 300kVA 500A
  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 630kVA 1000A
  • N. 8 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 1000kVA 1500A
  • N. 10 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 100kVA 300A
  • N. 4 pre-assembled and modular STC-Kiosk with ring configuration 34.5kV 100kVA 200A for public lighting

Related projects to eHouse

eHouse 33kV for BESS – Scotland

Scotland (United Kingdom)

Design, manufacturing and supply of an eHouse 33kV addressed to the Overhill Battery Energy Storage System, in Scotland, UK.

HV/MV Mobile Substation 110/20kV 40MVA

Fushë-Krujë (Albania)

Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.