MV Switchgears 6kV 2500/1250A 25kA for Thermoelectric Plant

Nuevitas (Cuba)

Country

Cuba

Year

2016

Description

The project has included engineering, construction and supply of an electrical substation with medium-voltage Normal Clad switchgears for the electrification of a thermoelectric power station.

Implementation of n. 27 medium-voltage Normal Clad switchgear cubicles 6kV 2500/1250A 25kA, low-voltage Euro-SDS switchboards, gas-insulated withdrawable circuit-breakers, HD4 type 12.12.25 12kV 1250A 25kA, Micom P143, Micom P243 and Micom P242 protection and auxiliary relays.

Related projects

Cable for Interconnection of Substations: Varadero, Casco Histórico e Hicacos

Varadero (Cuba)

The project has seen the laying and set up of the line cable 123kV with double circuit of 43km for the interconnection of high-voltage substations (HV) in the Varadero Casco Histórico and other high-voltage substations. The present installation has been carried out between the Casco Histórico and Hicacos.

HV/MV Substation 110/34.5kV 2x40MVA

Artemisa (Cuba)

The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.