MV Switchgears 6kV 2500/1250A 25kA for Thermoelectric Plant
Nuevitas (Cuba)
Country
Year
Description
The project has included engineering, construction and supply of an electrical substation with medium-voltage Normal Clad switchgears for the electrification of a thermoelectric power station.
Implementation of n. 27 medium-voltage Normal Clad switchgear cubicles 6kV 2500/1250A 25kA, low-voltage Euro-SDS switchboards, gas-insulated withdrawable circuit-breakers, HD4 type 12.12.25 12kV 1250A 25kA, Micom P143, Micom P243 and Micom P242 protection and auxiliary relays.
Related projects
MV Substation 34.5kV
Artemisa (Cuba)
The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".
N. 2 MV E-Houses for the most powerful turbine in Europe
Marghera Levante (Italy)
The challenging project has included the design, construction, and commissioning of n. 2 e-Houses for the port area of Marghera Levante (Venice).