MV Substation 34.5kV
Artemisa (Cuba)
Country
Year
Location
Solutions
Products
Description
The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".
The construction of the electrical substation, has included the supply of medium-voltage (MV) metal clad switchgears 36kV 1250A 25kA with a frequency of 60Hz for primary distribution, equipped with air-insulated circuit-breakers, protection relays and auxiliary accessories.
The substation also includes a system of auxiliary services in direct current and alternating current (AC/DC), low-voltage (LV) distribution panels Euro-SDS, indoor lighting system, air conditioning, protection system against electric shocks. The project has also included medium-voltage (MV) metal-enclosed ATR switchgears 36kV 630A 25kA with a frequency of 60Hz for secondary distribution.
The functionalities of the substations are supervised thanks to the SCADA Pacis system, optical fiber for connection with "ZDIM" electrical substation.
Related projects to SCADA Solution
MV Substation 24kV
Vedado (Cuba)
Design, construction and supply of electrical equipment destined for the new 5-star hotel "Torre K" in Vedado, in Havana.
HV/MV Mobile Substation 110/20kV 40MVA
Fushë-Krujë (Albania)
Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.