MV Substation 34.5kV

Artemisa (Cuba)

Description

The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".

The construction of the electrical substation, has included the supply of medium-voltage (MV) metal clad switchgears 36kV 1250A 25kA with a frequency of 60Hz for primary distribution, equipped with air-insulated circuit-breakers, protection relays and auxiliary accessories.
The substation also includes a system of auxiliary services in direct current and alternating current (AC/DC), low-voltage (LV) distribution panels Euro-SDS, indoor lighting system, air conditioning, protection system against electric shocks. The project has also included medium-voltage (MV) metal-enclosed ATR switchgears 36kV 630A 25kA with a frequency of 60Hz for secondary distribution. The functionalities of the substations are supervised thanks to the SCADA Pacis system, optical fiber for connection with "ZDIM" electrical substation.

Related projects to SCADA Solution

MV E-House 36kV for Artemisa development area

Artemisa (Cuba)

The Distribudora III project is addressed to an industrial district in Artemisa, in Cuba, and it is part of a collaboration work started in 2015.

SCADA System for the Control and Management of the Plant

Zarzouna (Tunisia)

The project, destined for the city of Zarzouna, in the Tunisian province of Biserta, has seen the supply and implementation of technological remote control and management devices. The system consists of various measuring and management devices that interface with the SCADA system for a generator plant.