MV Substation 13.8kV
Cayo Santa Maria (Cuba)
Country
Year
Location
Solutions
Products
Description
Design, construction and commissioning of a medium-voltage (MV) indoor electrical substation 13,8kV 2000A 25kA containing n. 22 air-insulated (AIS) medium-voltage (MV) Normal Clad switchgear cubicles, a low-voltage (LV) switchboard Euro-SDS 380/220V 60Hz, SCADA system for the control of the plant.
Related projects to Electrical substation
HV/MV Substation 110/20kV 25MVA
Durrës (Albania)
Design, construction, installation and commissioning of electrical equipment for the high-voltage to medium-voltage substation HV/MV, connected to a hydro power plant.
N. 5 substations 13.8kV and 34.5kV 54.8MVA
Jardines del Rey (Cuba)
The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.