MV E-HOUSE 33kV 20MVA FOR BESS

Surrey (United Kingdom)

Country

United Kingdom

Year

2023

Description

Design, manufacturing and commissioning of Switching station STC-Box 33kV 20MVA, designed for the BESS plant 20 MW/40 MWh in Farnham, Surrey (UK).

The plug-in modular eHouse, supplied to TESLA, is equipped with:

  • MV switchgear ATR 36kV 630A 25kA
  • LV switchboard Euro-SDS
  • DC system 110 VDC
  • AC/AC UPS
  • Weather Station
  • Patch Panel
  • HVAC system
With the STC-Box, we are redefining the standards of switching stations, offering enhanced functionality, reliability, and ease of operation for Battery energy storage systems (BESS), which are used to store energy from renewable plants for later use during critical periods. The advantages of these systems include cost savings, clean energy and reduced downtime.
Credit picture: Harmony Energy

Related projects to eHouse

E-HOUSE 33kV FOR UK BESS PLANT

Newburgh (United Kingdom)

We have designed, constructed, and supplied an eHouse STC-Box for the Battery Energy Storage System (BESS), in the UK.

MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system

Luton (United Kingdom)

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).