N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System
Yorkshire (United Kingdom)
Country
Year
Description
Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).
The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.
Related projects to eHouse
MV E-House 20kV for Tesla Battery Energy Storage System
West Sussex (United Kingdom)
Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).
N. 2 HV/MV Mobile Substations 110/33kV 16MVA
Basra (Iraq)
These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.