N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System

Yorkshire (United Kingdom)

Country

United Kingdom

Year

2022

Description

Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).

The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.

Related projects to eHouse

MV Mobile Substation 23kV

Asunción (Paraguay)

Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.

HV/MV E-House 220/38.5kV for steelwork plant

Artemisa (Cuba)

The great project has included a 220/38.5kV electrical substation, designed for a steelwork.