N.2 MV E-House 33kV 50MVA for Tesla Battery Energy Storage System

Yorkshire (United Kingdom)

Country

United Kingdom

Year

2022

Description

Design, construction and supply of n. 2 switching stations equipped with power transformers, MV air-insulated ATR switchgear 36kV 1250A 20kA (1s), LV switchboards, and a SCADA system for the remote control, destined to Tesla BESS (Battery Energy Storage System).

The Pillswood e plant in Yorkshire has a total power of 98 MW.
Our switching stations connect the Tesla Megapack to the electrical grid.

Related projects to eHouse

EHOUSE 36kV FOR PV PLANT 150MWp

Viterbo (Italy)

We have designed, constructed and supplied a MV and a LV eHouse for a 150 MWp ground-mounted photovoltaic plant located in Tuscania, in the province of Viterbo.

N. 2 HV/MV Mobile Substations 110/33kV 16MVA

Basra (Iraq)

These are the first n. 2 mobile substations designed and realized by C.R. Technology Systems S.p.A. and are used to provide electricity to remote areas of Basra.