MV Transformation cabin 34.5/0.48kV for oil plant
Havana (Cuba)
Country
Year
Location
Solutions
Products
Description
The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.
On Friday 4th October 2019 it has been inaugurated the first horizontal drilling well, which constitutes a joint project between the Eurasian country and Cuba.
The plant has also included our ISO container 34,5/0,48kV 630kVA, containing medium-voltage (MV) ATR-Ring switchgear 4,5kV 630A 16kA.
Concerning this project, the peculiarity of this solution is the automatic ventilation system of the transformer room, which allows coping with the tropical climate typical of the Caribbean area.
Related projects to Transformation cabin
MV Transformation cabin 40.5kV for photovltaic system
Artemisa (Cuba)
Design, construction and commissioning of a grid connection cabin, STC-Kiosk, for a 7MW photovoltaic plant located in the Province of Artemisa.
N. 2 Transformation cabin 34.5kV
Jardines del Rey (Cuba)
Design, supply and implementation of the n. 2 compact substations 34,5kV in the Jardines del Rey area, located in Camagüey.