MV Transformation cabin 34.5/0.48kV for oil plant
Havana (Cuba)
Country
Year
Location
Solutions
Products
Description
The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.
On Friday 4th October 2019 it has been inaugurated the first horizontal drilling well, which constitutes a joint project between the Eurasian country and Cuba.
The plant has also included our ISO container 34,5/0,48kV 630kVA, containing medium-voltage (MV) ATR-Ring switchgear 4,5kV 630A 16kA.
Concerning this project, the peculiarity of this solution is the automatic ventilation system of the transformer room, which allows coping with the tropical climate typical of the Caribbean area.
Related projects to Transformation cabin
MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system
Cuneo (Italy)
We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.
N. 4 MV E-Houses 34.5kV for industrial area
Havana (Cuba)
The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.