Medium-Voltage (MV) Metal Clad switchgears 12kV 2500A 25kA
Santa Cruz de la Sierra, Andrés Ibáñez (Bolivia)
Country
Year
Description
The ambitious project has been destined to a cement factory in Santa Cruz de la Sierra, in Andrés Ibáñez, the largest city in Bolivia.
The project includes the design and installation of n. 30 medium-voltage metal-clad switchgear cubicles 12kV 2500A 25kA, equipped with gas-insulated circuit breakers, placed on a raised modular basement, with the advantage of being easily assembling on site.
Related projects
MV/MV Mobile Substations 35/10.5/6.3kV 7.5MVA
Fushë Krujë, Fier (Albania)
The project includes the supply of two mobile substations in the south of Albania, Fushë Krujë and Fier, where the Government has invested a large amount of money in order to increase the supply of the electrical grid.
MV Transformation cabin 34.5/0.48kV for energy distribution
Cuba