MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB
Calcinate (Italy)
Country
Year
Description
Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.
Overall, the project includes:
- N. 60 projectors on 10 light towers 32 meters high
- N. 30 road poles perimeter to the plant
- Replacement of lighting bodies on the various signs
- N. 35 lighting bodies on steel stretches for lighting between the various warehouse bodies
- Energy maintenance works for restoring old plants, using materials provided by Gewiss;
- Monitoring of plants and cleaning of electrical shelters;
- Replacement with new lighting fixtures in light towers, located in the forecourt;
- Requalification and management of entrance guard systems;
- Replacement of medium-voltage circuit-breakers;
- Retrofit of swtichgears.
Related projects to Power station
eHouse 33kV for BESS – Scotland
Scotland (United Kingdom)
Design, manufacturing and supply of an eHouse 33kV addressed to the Overhill Battery Energy Storage System, in Scotland, UK.
eHouse 33kV for PV plant expansion
Viterbo (Italy)
We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.