MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB

Calcinate (Italy)

Country

Italy

Year

2021

Location
Solutions
Products
Description

Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.

Overall, the project includes:

  • N. 60 projectors on 10 light towers 32 meters high
  • N. 30 road poles perimeter to the plant
  • Replacement of lighting bodies on the various signs
  • N. 35 lighting bodies on steel stretches for lighting between the various warehouse bodies
At the same time, we are implementing a prefabricated 10x5meter “Field” exhibition structure. This maintenance activity, both ordinary and extraordinary, is part of a project which in detail includes:
  • Energy maintenance works for restoring old plants, using materials provided by Gewiss;
  • Monitoring of plants and cleaning of electrical shelters;
  • Replacement with new lighting fixtures in light towers, located in the forecourt;
  • Requalification and management of entrance guard systems;
  • Replacement of medium-voltage circuit-breakers;
  • Retrofit of swtichgears.

Related projects to Power station

eHouses for thermoelectric power plant

Chieti (Italy)

Design, construction and supply of n. 2 plug-in cabins for the Thermoelectric Power Plant in Chieti, Italy.

MV/HV EHOUSE 36kV FOR PHOTOVOLTAIC PLANT

Arlena di Castro (Italy)

Design, construction and commissioning of the compact substation STC-Box addressed to the photovoltaic plant in Arlena di Castro (Viterbo), studied to deliver sustainable energy and pave the way towards a greener future.