The project has involved the implementation and supply of materials for the 34,5kV and 13,8kV electrical substations in the port area of Artemisa.

The implementation of medium-voltage (MV) switchgears ATR 13,8kV 630A 20kA, with a frequency of 60Hz and with LSC2A, involves:

  • 11 cubicles for the main electrical substation "CGD" situated in the port
  • 20 cubicles for n. 2 electrical substations, 6 of which consist of columns 34,5kV 630A 16kA and are used for the operation of the refrigeration terminals

Related projects to eHouse

E-Houses for BESS 100MW and 50MW-200MWh

Lakeside (UK) and Belgium

eHouse addressed to Tesla BESS plants 100 MW in Lakeside and 50MW-200MWh for Eneco, in Belgium.

MV E-House 13.8kV for electrical grid

Puerto Cabello (Venezuela)

The project has included modular shelters and medium and low-voltage switchgears, for the modernization of generators in Venezuela.