HV Substation 35/110kV 15MVA

Tirana (Albania)

Country

Albania

Year

2011

Description

The project has included the construction of an electrical substation in Albania.

It has involved the study, construction and start-up of an electrical substation and the equipment necessary for its operation. The substation includes:

  • Medium-voltage (MV) metal-enclosed ATR switchgear 35kV 1250A 31.5kVA (5 columns)
  • Low-voltage (LV) protection and control panel SDS 400/230V
  • 110kV field device, consisting of 110kV 1250A 25kA circuit-breakers, disconnectors with earth blades, a 72kV earthing knife switch, voltage transformers, current transformers, power transformer, auxiliary transformer, surge arresters and metal structure.

Related projects to Electrical substation

HV/MV Substation 110/34.5kV 2x25MVA

Varadero (Cuba)

The project has included the study, installation and supply of the electrical substation "Punta Hicacos".

HV/MV Substation 115/6.3kV 4.7MVA

Shpellë (Albania)

Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.