The project, result of an important partnership, is addressed to a historical industrial company located in Smergoncino, in Rovigo area. The long-lasting know-how gained in the high-voltage field has made it possible to increase the plant power supply.

The high-voltage components installed are:

  • HV disconnectors
  • HV circuit breakers
  • current and voltage transformers
  • overvoltage surge arresters
  • HV cable terminals

Related projects to Electrical substation

Electrical installation works for industrial plant

Pieve Vergonte (Italy)

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).

MV Substation 13.8kV

Cayo Santa Maria (Cuba)

Design, construction and commissioning of a medium-voltage (MV) indoor electrical substation 13,8kV 2000A 25kA containing n. 22 air-insulated (AIS) medium-voltage (MV) Normal Clad switchgear cubicles, a low-voltage (LV) switchboard Euro-SDS 380/220V 60Hz, SCADA system for the control of the plant.