HV/MV Substation 115/6.3kV 4.7MVA

Shpellë (Albania)

Country

Albania

Year

2018

Description

Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.

The project consists of metal-enclosed medium-voltage ATR switchgears 12kV 630A 16kA, a power transformer 4.7MVA, an auxiliary transformer 160kVA 6.3/0.4kV, a protection and control panel, a low-voltage (LV) panel AC/DC, high-voltage (HV) circuit breakers, disconnectors, current transformer and voltage transformer (TA/TV), surge arrester, battery system.

Related projects to Electrical substation

MV/MV Electrical substation 13.8/34.5kV 50MVA

Cayo Cruz (Cuba)

Study, design, construction and supply of electrical substation equipment addressed to n. 8 diesel turbines in Cayo Cruz, Cuba.

N. 5 substations 13.8kV and 34.5kV 54.8MVA

Jardines del Rey (Cuba)

The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.