The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.
The substation is divided into:
- 110kV field, including power transformers 40MVA, disconnectors, surge arresters, circuit-breakers
- 34,5kV field, including n. 25 medium-voltage (MV) Normal Clad switchgear cubicles 34,5kV 1250A 25kA
Related projects to Electrical substation
MV/MV indoor Substation 13.8/34.5kV 25MVA
Camagüey (Cuba)
Camagüey is a popular holiday destination in Cuba, where the recent increase in the power demand has made it necessary to invest in the implementation of new electrical substations.
HV/MV Substation 110/34.5kV 40MVA
Holguín (Cuba)
Engineering study, construction and commissioning of an outdoor electrical substation HV/MV 110/34.5kV 40MVA for the implementation of the new tourist center of Ramón de Antilla, in Holguín.