HV/MV Substation 110/34.5kV 40MVA

Holguín (Cuba)

Description

Engineering study, construction and commissioning of an outdoor electrical substation HV/MV 110/34.5kV 40MVA for the implementation of the new tourist center of Ramón de Antilla, in Holguín.

The substation configuration includes:

  • Medium-voltage (MV) metal-clad air-insulated switchgear (AIS) 34.5kV 2500A 25kA counting n. 17 cubicles
  • Low voltage (LV) panels 220/127V 60Hz
  • SCADA PACiS system
  • Power and current transformers 40MVA
  • Automatic switching system
  • Internal arc detection sensors (arc-protection)
  • Protection relay
  • Measurement modules
  • Auxiliary equipment

Related projects to Electrical substation

HV/MV indoor Substation 110/13.8kV 25MVA

Varadero (Cuba)

Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.

HV/MV Substation 115/6.3kV 4.7MVA

Shpellë (Albania)

Construction of the electrical system of a hydroelectric plant in Shpellë. Hydroelectric energy is based on the conversion of natural water flow into electricity and is classified as renewable energy because it is generated by exploiting the kinetic force given by the natural water cycle.