HV/MV Substation 110/34.5kV 25MVA

Puerto Escondido (Cuba)

Country

Cuba

Year

2016

Description

The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of ​​Petrolero, in Puerto Escondido district.

The design, implementation and supply of the project include:

  • Hybrid module with a "Y" scheme 110 kV
  • N. 7 medium-voltage switchgear cubicles (MV) Normal Clad 36kV, with a frequency of 60Hz
  • 25MVA power transformer
  • Protection and control system consisting of low-voltage (LV) Euro P&C cells.

Related projects

N. 10 E-Houses 34.5kV for temporary applications

La Havana (Cuba)

It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.

MV Normal Clad switchgears for steelwork plant

Hatay (Turkey)

N. 2 air-insulated (AIS) medium-voltage (MV) Normal Clad electrical switchgears (14 cubicles) 12kV 1250A 31.5kA (25kA arc-resistant) equipped with a gas outlet duct, relays, VA VT, and circuit-breakers. The project, commissioned by our Swiss client, is addressed to a steelwork plant in Turkey.