HV/MV Substation 110/20kV 25MVA
Durrës (Albania)
Country
Year
Description
Design, construction, installation and commissioning of electrical equipment for the high-voltage to medium-voltage substation HV/MV, connected to a hydro power plant.
The substation is equipped with VT, surge arresters, disconnectors, current transformer, power transformers 110/20kV 25MVA, SCADA system, protection panels Euro P&C.
Related projects to Electrical substation
Electrical installation works for industrial plant
Pieve Vergonte (Italy)
The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).
HV Substation 35/110kV 15MVA
Tirana (Albania)
The project has included the construction of an electrical substation in Albania.