HV/MV Substation 110/13.8kV 40MVA

Havana (Cuba)

Country

Cuba

Year

2014

Description

Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.

The project has included the engineering study, construction and commissioning of a high-voltage substation 110/13,8kV 40MVA. It includes 110kV circuit-breakers, disconnectors, transformers, surge arresters, n. 18 medium-voltage (MV) Normal Clad switchgear cubicles 13,8kV, low-voltage (LV) Euro P&C switchboards for the protection and automation of the plant, low-voltage Euro SDS switchboards for the measurement and energy distribution, 3-phase reactors, plant lighting system, firefighting system, auxiliary electrical equipment.

Related projects to Electrical substation

MV/MV Electrical substation 13.8/34.5kV 50MVA

Cayo Cruz (Cuba)

Study, design, construction and supply of electrical substation equipment addressed to n. 8 diesel turbines in Cayo Cruz, Cuba.

HV/MV Substation 110/34.5kV 2x25MVA

Varadero (Cuba)

The project has included the study, installation and supply of the electrical substation "Punta Hicacos".