HV/MV Substation 110/13.8kV 40MVA

Havana (Cuba)

Country

Cuba

Year

2014

Description

Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.

The project has included the engineering study, construction and commissioning of a high-voltage substation 110/13,8kV 40MVA. It includes 110kV circuit-breakers, disconnectors, transformers, surge arresters, n. 18 medium-voltage (MV) Normal Clad switchgear cubicles 13,8kV, low-voltage (LV) Euro P&C switchboards for the protection and automation of the plant, low-voltage Euro SDS switchboards for the measurement and energy distribution, 3-phase reactors, plant lighting system, firefighting system, auxiliary electrical equipment.

Related projects to Electrical substation

N. 4 MV Substations 34.5 and 13.8kV 77.2MVA

Cayo Coco, Cayo Guillermo, Uva Caleta, Flamenco (Cuba)

The ambitious project has seen the creation of four electrical substations addressed to different areas of the Cuban Republic.

HV/MV Substation 110/34.5 kV 25MVA

Artemisa (Cuba)

The project has involved the study, construction and start-up of an electrical substation in the province of Artemisa, in Cuba.