HV/MV Mobile Substation 110/20kV 40MVA
Fushë-Krujë (Albania)
Country
Year
Location
Solutions
Products
Description
Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.
Fundamental to the realization of the project was the support of the Minister of Infrastructures and Energy, Belinda Balluku, who thanks to this solution was able to guarantee access to electricity in a hostile area. The structure includes ATR medium-voltage switchgears 20kV 1250A 16kA, a shelter for primary distribution 20kV, which powers n. 120 medium-voltage shelter for secondary distribution, n. 2,500 pole-mounted lamps, guaranteeing public lighting and supporting a network infrastructure that branches off for 130 km. The protection and surveillance of the installation are granted by a SCADA system.
Related projects to Mobile Substation
HV/MV Mobile Substation 115/13.8 kV 10MVA
Aragua (Venezuela)
The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.
HV/MV Mobile substation 115/37.5/10.5kV 10MVA
Udënisht, Korçë (Albania)
The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.