This project has the peculiarity of being installed inside a building specifically designed in respect of the surrounding environment, notoriously recognized for its touristic value.

The electrical substation for primary transformation and distribution was built on a 2.5-meter high structure, in order to limit damage in the event of flooding. The high-voltage substation consists of a hybrid PASS system, two 25MVA HV/MV transformers, medium-voltage air-insulated Normal Clad switchgear 24kV, low-voltage switchboards EURO P&C and EURO SDS, power transformers, lighting. It also includes a CO2 and a fire detection system for the main transformers, a remote video surveillance system and SCADA system.

Related projects to Electrical substation

N. 5 substations 13.8kV and 34.5kV 54.8MVA

Jardines del Rey (Cuba)

The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.

MV/MV Substation 34.5/13.8kV 6.3MVA

Pesquero (Cuba)

Design, construction and installation of electrical equipment destined for the revamping and empowerment of an outdoor electrical substation MV/MV 34.5/13.8kV serving a tourist center located in the province of Holguín (Cuba).