HV/MV indoor Substation 110/13.8kV 25MVA

Varadero (Cuba)

Description

This project has the peculiarity of being installed inside a building specifically designed in respect of the surrounding environment, notoriously recognized for its touristic value.

The electrical substation for primary transformation and distribution was built on a 2.5-meter high structure, in order to limit damage in the event of flooding. The high-voltage substation consists of a hybrid PASS system, two 25MVA HV/MV transformers, medium-voltage air-insulated Normal Clad switchgear 24kV, low-voltage switchboards EURO P&C and EURO SDS, power transformers, lighting. It also includes a CO2 and a fire detection system for the main transformers, a remote video surveillance system and SCADA system.

Related projects to Electrical substation

MV/MV indoor substation 34.5/13.8kV 10MVA

Matanzas (Cuba)

In the Cuban area of Matanzas, to grant the increasing demand for electricity during the tourist season, we realized an electrical substation that guarantees high technological performances together with a harmonious impact in the landscape context.

MV/MV Substation 34.5/13.8kV 6.3MVA

Pesquero (Cuba)

Design, construction and installation of electrical equipment destined for the revamping and empowerment of an outdoor electrical substation MV/MV 34.5/13.8kV serving a tourist center located in the province of Holguín (Cuba).