HV/MV indoor Substation 110/13.8kV 25MVA

Varadero (Cuba)

Description

This project has the peculiarity of being installed inside a building specifically designed in respect of the surrounding environment, notoriously recognized for its touristic value.

The electrical substation for primary transformation and distribution was built on a 2.5-meter high structure, in order to limit damage in the event of flooding. The high-voltage substation consists of a hybrid PASS system, two 25MVA HV/MV transformers, medium-voltage air-insulated Normal Clad switchgear 24kV, low-voltage switchboards EURO P&C and EURO SDS, power transformers, lighting. It also includes a CO2 and a fire detection system for the main transformers, a remote video surveillance system and SCADA system.

Related projects to Electrical substation

HV/MV Substation 110/34.5kV 2x40MVA

Artemisa (Cuba)

The project has included the study, construction, and installation of a hybrid GIS electrical substation, to supply energy to an industrial area in Atemisa.

MV Substation 34.5kV

Artemisa (Cuba)

The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".