HV/MV Substation 110/34.5kV 25MVA
Puerto Escondido (Cuba)
Country
Year
Description
The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of Petrolero, in Puerto Escondido district.
The design, implementation and supply of the project include:
- Hybrid module with a "Y" scheme 110 kV
- N. 7 medium-voltage switchgear cubicles (MV) Normal Clad 36kV, with a frequency of 60Hz
- 25MVA power transformer
- Protection and control system consisting of low-voltage (LV) Euro P&C cells.