HV/MV Substation 110/34.5kV 25MVA

Puerto Escondido (Cuba)

Country

Cuba

Year

2016

Description

The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of ​​Petrolero, in Puerto Escondido district.

The design, implementation and supply of the project include:

  • Hybrid module with a "Y" scheme 110 kV
  • N. 7 medium-voltage switchgear cubicles (MV) Normal Clad 36kV, with a frequency of 60Hz
  • 25MVA power transformer
  • Protection and control system consisting of low-voltage (LV) Euro P&C cells.