HV/MV Substation 110/34.5kV 25MVA
Puerto Escondido (Cuba)
Country
Year
Description
The project has involved the supply of material to increase the high-voltage to medium-voltage electrical substation (HV/MV) in the developing area of Petrolero, in Puerto Escondido district.
The design, implementation and supply of the project include:
- Hybrid module with a "Y" scheme 110 kV
- N. 7 medium-voltage switchgear cubicles (MV) Normal Clad 36kV, with a frequency of 60Hz
- 25MVA power transformer
- Protection and control system consisting of low-voltage (LV) Euro P&C cells.
Related projects
MV/MV indoor Substation 13.8/34.5kV 25MVA
Camagüey (Cuba)
Camagüey is a popular holiday destination in Cuba, where the recent increase in the power demand has made it necessary to invest in the implementation of new electrical substations.
Skid transformation cabin 36kV 4.4MVA
Trino Vercellese (Italy)
We have designed, manufactured and carried out the commissioning of STC-Skid transformer substations destined for the Trino Vercellese photovoltaic plant.