HV/MV Substation 110/13.8kV 40MVA
Havana (Cuba)
Country
Year
Location
Solutions
Products
Description
Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.
The project has included the engineering study, construction and commissioning of a high-voltage substation 110/13,8kV 40MVA. It includes 110kV circuit-breakers, disconnectors, transformers, surge arresters, n. 18 medium-voltage (MV) Normal Clad switchgear cubicles 13,8kV, low-voltage (LV) Euro P&C switchboards for the protection and automation of the plant, low-voltage Euro SDS switchboards for the measurement and energy distribution, 3-phase reactors, plant lighting system, firefighting system, auxiliary electrical equipment.
Related projects to Electrical substation
N. 5 substations 13.8kV and 34.5kV 54.8MVA
Jardines del Rey (Cuba)
The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.
HV/MV Substation 110/34.5 kV 25MVA
Artemisa (Cuba)
The project has involved the study, construction and start-up of an electrical substation in the province of Artemisa, in Cuba.