Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.
The photovoltaic system has a power of 89.5 MWp and is connected to the national grid.
Our compact electrical substation STC-Box is equipped with:
- N. 7 medium-voltage (MT) air-insulated (AIS) cubicles ATR 20kV 2500A 25kA
- Low-voltage panels (LV)
- Protection panels
- SCADA system
- Auxiliary transformer
- HVAC systems
- Auxiliary equipment
Related projects to eHouse
HV/MV Mobile Substation 115/13.8 kV 10MVA
Aragua (Venezuela)
The project has involved the study and construction of a mobile substation 115/13.8kV 10MVA, with a frequency of 60Hz, with the aim of guaranteeing the supply of electricity in a rural area of Venezuela.
MV E-House 34.5kV for industial district
Artemisa (Cuba)
The project, carried out in the industrial district called “National Center” located in Artemisa, has consisted of the supply of materials, products and systems, for the installation of medium-voltage distribution STC-Box shelters.