MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Country

Italy

Year

2021

Description

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.

The photovoltaic system has a power of 89.5 MWp and is connected to the national grid.
Our compact electrical substation STC-Box is equipped with:

  • N. 7 medium-voltage (MT) air-insulated (AIS) cubicles ATR 20kV 2500A 25kA
  • Low-voltage panels (LV)
  • Protection panels
  • SCADA system
  • Auxiliary transformer
  • HVAC systems
  • Auxiliary equipment

Related projects to eHouse

MV Mobile Substation 23kV

Asunción (Paraguay)

Study, design, construction of a mobile substation 23kV composed of two trailers, 17 m each. It will be used for the extension of the electrical substation, and emergency and maintenance needs, in Paraguay.

MV E-Houses 34.5kV and 13.8kV for the port area

Artemisa (Cuba)

The project has involved the implementation and supply of materials for the 34,5kV and 13,8kV electrical substations in the port area of Artemisa.