N. 4 MV Substations 34.5 and 13.8kV 77.2MVA

Cayo Coco, Cayo Guillermo, Uva Caleta, Flamenco (Cuba)

Description

The ambitious project has seen the creation of four electrical substations addressed to different areas of the Cuban Republic.

Four electrical substations have been designed and put into service:

  • Cayo Coco substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears, 2x 16/20MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage switchborads, SCADA Pacis data acquisition and control system
  • Cayo Guillermo substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears, 2x 10MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage electrical switchboards, SCADA Pacis data acquisition and control
  • Flamenco substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears. 2x 6,3MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage electrical switchboards, SCADA Pacis data acquisition and control system
  • Caleta substation 13,8kV and 34,5kV, which includes metal clad electrical switchgears, 2x 6,3MVA power transformers, 13,8kV landfill transformers, Euro-SDS and Euro-P&C low-voltage switchgears, SCADA Pacis data acquisition and control system
The substations are also equipped with a lighting system, video surveillance and air-conditioning systems, equipment for the interconnection system

Related projects to Electrical substation

Switchgear 40.5kV for steelwork plant

San Luis Potosì (Mexico)

Design, construction and supply of metal-clad switchgear 40.5kV addressed to a steelwork site in the upland territory of San Luis Potosì, Mexico.

Reactors and Medium-Voltage (MV) Switchgears for electrical substations

Jardines del Rey (Cuba)

Supply of materials and auxiliary accessories for the set-up of four reactors for the delivery of electricity in theJardines del Rey area in the province of Ciego de Ávila, in Cuba.