N. 4 MV Substations 34.5 and 13.8kV 77.2MVA

Cayo Coco, Cayo Guillermo, Uva Caleta, Flamenco (Cuba)

Description

The ambitious project has seen the creation of four electrical substations addressed to different areas of the Cuban Republic.

Four electrical substations have been designed and put into service:

  • Cayo Coco substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears, 2x 16/20MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage switchborads, SCADA Pacis data acquisition and control system
  • Cayo Guillermo substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears, 2x 10MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage electrical switchboards, SCADA Pacis data acquisition and control
  • Flamenco substation 13,8kV and 34,5kV, which includes Normal Clad electrical switchgears. 2x 6,3MVA power transformers, 13,8kV earthing transformers, Euro-SDS and Euro-P&C low-voltage electrical switchboards, SCADA Pacis data acquisition and control system
  • Caleta substation 13,8kV and 34,5kV, which includes metal clad electrical switchgears, 2x 6,3MVA power transformers, 13,8kV landfill transformers, Euro-SDS and Euro-P&C low-voltage switchgears, SCADA Pacis data acquisition and control system
The substations are also equipped with a lighting system, video surveillance and air-conditioning systems, equipment for the interconnection system

Related projects to Electrical substation

MV/MV indoor Substation 13.8/34.5kV 25MVA

Camagüey (Cuba)

Camagüey is a popular holiday destination in Cuba, where the recent increase in the power demand has made it necessary to invest in the implementation of new electrical substations.

Electrical installation works for industrial plant

Pieve Vergonte (Italy)

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).