N. 7 MV E-Houses 24kV for generator plants

Guacara e Tucacos (Venezuela)

Country

Venezuela

Year

2010

Location
Solutions
Products
Description

The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.

The project has included the design, implementation, and supply of electrical equipment, addressed to two different areas:

  • In Guacara were supplied n. 4 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 56 units 1700kW each.
  • In the city of Tucacas, were supplied n. 3 STC-Box shelters, with Normal Clad cubicles 13.8kV 2000A 31.5kA, with a frequency of 60Hz for the diesel power station consisting of n. 48 units 1700kW each.

Related projects to eHouse

N. 4 MV switchrooms 33kV and 1 control room for BESS

Norwich (United Kingdom)

We have designed, manufactured and supply Ørsted’s first large-scale Battery Energy Storage System (BESS) in the UK.

MV E-House 20kV for Tesla Battery Energy Storage System

West Sussex (United Kingdom)

Engineering study, design, construction, and supply of n. 1 compact substation STC-Box for a Tesla project in West Sussex (UK).