N. 4 MV E-Houses 23kV for electrification of rural areas
Gonaives e Cabo Haitiano (Haiti)
Country
Year
Description
The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.
It has involved the study, construction, and supply of n. 4 STC-Box compact substations, each containing n. 10 medium-voltage (MV) metal enclosed ATR switchgear cubicles 23kV 630A 25kA (1s), with a frequency of 60Hz, current transformers, SCADA supervision, and control system.
Related projects to eHouse
MV eHouse 33KV for battery energy storage system 100MW
Pillswood (United Kingdom)
The project includes the deisgn, manufacturing and supply of nr. 2 E-Houses 33kV, equipped with ATR switchgear 36kV 1250A 20kA(1s) for Pillswood BESS plants 100MW.
N. 7 MV E-Houses 24kV for generator plants
Guacara e Tucacos (Venezuela)
The project was carried out in Guacara and Tucacas, tourist cities located in Venezuela. It has seen the implementation of several compact substations, destined to Hyundai generator plants.