N. 4 MV E-Houses 23kV for electrification of rural areas

Gonaives e Cabo Haitiano (Haiti)

Country

Haiti

Year

2006

Description

The project has included n. 4 compact substations, with the aim to supply the electricity in the rural areas of Gonaives and Cabo Haitiano.

It has involved the study, construction, and supply of n. 4 STC-Box compact substations, each containing n. 10 medium-voltage (MV) metal enclosed ATR switchgear cubicles 23kV 630A 25kA (1s), with a frequency of 60Hz, current transformers, SCADA supervision, and control system.

Related projects to eHouse

MV eHouse 33kV 25MVA and 49,5MVA for battery energy storage system

Luton (United Kingdom)

The project consists in the design, manufacturing, and commissioning of an eHouse in the Chapel farm plant 49,5MW/99MWh near Luton (UK), connected to the Tesla Battery Energy Storage System (BESS).

MV E-House 20kV for photovoltaic plant

Cipollaretta (Italy)

Design and construction of an E-House, for the Alzo electrical substation, carried out by our Sister Company C.R. Project Service. It is connected to the largest photovoltaic system in the Viterbo area and occupies 101 hectares in the Cipollaretta area.