HV/MV indoor Substation 110/13.8kV 25MVA
Varadero (Cuba)
Country
Year
Location
Solutions
Products
Description
Construction of an electrical substation in Varadero, located in a structure designed to protect the high-voltage (HV) and medium-voltage (MV) equipment against the atmospheric conditions that characterize this geographical area.
The project included the construction of a gas-insulated electrical substation, consisting of a H-shaped hybrid system, equipped with two input switches and two start switches, six isolators, six overvoltage surge arresters, two power transformers 25MVA and a medium-voltage (MV) switchgear Normal Clad 24kV and auxiliary service transformer.
The substation also includes low-voltage (LV) Euro SDS panels, a production and automation system for the electrical substation consisting of Euro P&C protection panels, control systems, automation and supervision, a duplicated direct current system, lighting systems, video surveillance and fire protection system, air conditioning.
Related projects to Electrical substation
MV/MV indoor substation 34.5/13.8kV 10MVA
Matanzas (Cuba)
In the Cuban area of Matanzas, to grant the increasing demand for electricity during the tourist season, we realized an electrical substation that guarantees high technological performances together with a harmonious impact in the landscape context.
MV Substation 34.5kV
Artemisa (Cuba)
The project has been carried out in the famous industrial center in Artemisa. It has included accessories for an electrical substation 34,5kV and the associated substation "Switching Center".