Electrical installation works for industrial plant

Pieve Vergonte (Italy)

Country

Italy

Year

2020

Description

The project has included the works to expand the high-voltage (HV) electrical substation serving the Hydrochem Srl plant in Pieve Vergonte (Piedmont).

C.R. Technology Systems has supervised and coordinated the team and the activities on site, carried out in record times.
In detail, HV electrical equipment was installed and put into service through a process of energizing the substation in two phases, and it included:

  • Transformers
  • Disconnectors
  • Circuit-breakers
  • Line insulators
  • Surge arresters
  • Portal 2 intermediate
  • Portal 2 Side stalls A and B

Related projects to Electrical substation

N. 5 substations 13.8kV and 34.5kV 54.8MVA

Jardines del Rey (Cuba)

The project has involved the implementation of n. 5 E-House compact substations, located in Jardines del Rey, a touristic strategical Cuban area nearby the airport and seaport.

HV/MV Substation 110/13.8kV 40MVA

Havana (Cuba)

Realization of a high-voltage to medium-voltage electrical substation in a historic thermoelectric plant in Havana.