eHouse 33kV for PV plant expansion

Viterbo (Italy)

Country

Italy

Year

2024

Description

We have designed, manufactured and supplied an eHouse intended for the expansion of the photovoltaic plant in Montalto di Castro, Italy.

The compact electrical substation is equipped with a MV switchgear ATR 30kV 2000A 20kA, HVAC, fiscal meter, UPS, die-cast resin transformer, LV switchboards Euro-SDS, auxiliary equipment. This substation project is a significant initiative for the integration of photovoltaic energy into the local electricity grid. This project involves the construction of a substation that will transform the energy generated by solar panels into energy usable for distribution.

Related projects to eHouse

Nr 2 eHouse 33kV switching station – Bumper for BESS

Ilmer, Princess Risborough (UK)

We are currently engaged in a new project, involving the construction of two MV Switching stations for an upcoming Battery Energy Storage System (BESS) initiative. These stations will be situated in Severalles Farm, Ilmer, Princess Risborough, UK, supplying 100MWh as storage capacity.

HV/MV Mobile substation 115/37.5/10.5kV 10MVA

Udënisht, Korçë (Albania)

The project has included design, installation and supply of a mobile substation in Udënisht, a well-known touristic area, in Korçë, and the sixth most important town in Albania.