eHouse 33kV for BESS in Lancashire

Chorley (United Kingdom)

Country

United Kingdom

Year

2024

Description

Design, construction and delivery of an eHouse destined to the BESS systems connected to a photovoltaic plant in Chorley, Lancashire (UK), with the aim of powering the local grid.

Our plug-in compact substation is equipped with MV switchgear ATR 36kV 1250A 25kA (1s), marshalling box, HVAC system, LV Switchboards, fire detection System, Rectifier 400 VAC/110 VDC with battery System, SCADA panel.
The Battery Energy Storage System is designed to improve the scalability and efficiency of the energy generated by the photovoltaic plant, allowing the storage of excess energy, which can then be released during peak times. This solution has revolutionized the energy market, and it is particularly essential in areas where meteorological conditions are variable and require technologies that ensure high performance standards, such as in England.

Related projects to Power station

EHOUSE 36kV 42MW BESS PLANT

Hyde (United Kingdom)

We have delivered our eHouse, STC-Box 33kV type, addressed to a Battery Energy Storage System, located in Hyde (UK).

MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB

Calcinate (Italy)

Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.