eHouse 33kV for BESS 50MW in Scotland

Pitkevy (Scotland)

Country

United Kingdom

Year

2024

Description

E-House equipment for Battery Energy Storage System (BESS) 50MW in Pitkevy, Scotland.

This project, undertaken for a leading renewable energy company, encompasses the comprehensive design, construction, and supply of an advanced plug-in eHouse. Our innovative eHouse, the STC-Box 33kV, features medium voltage air-insulated ATR switchgear 36kV 1250A 25kA(1s), low-voltage switchboards, Euro P&C patch panel, SCADA panel, and a sophisticated fire detection system.

Related projects to Power station

eHouse 33kV for BESS – Scotland

Scotland (United Kingdom)

Design, manufacturing and supply of an eHouse 33kV addressed to the Overhill Battery Energy Storage System, in Scotland, UK.

MAINTENANCE AT GEWISS LOGISTICS-TECHNOLOGICAL HUB

Calcinate (Italy)

Maintenance plan at Gewiss headquarters in Calcinate (Bergamo). Specifically, it is a lighting efficiency intervention outside the plant.