eHouses for thermoelectric power plant
Chieti (Italy)
Country
Year
Location
Solutions
Products
Description
Design, construction and supply of n. 2 plug-in cabins for the Thermoelectric Power Plant in Chieti, Italy.
- N. 1 e-House equipped with MV electrical switchgear 7.2kV 1250A 40kA(1s), n. 2 power transformers 350kVA, LV connection cables, air conditioning system, auxiliary equipment.
- N. 1 e-House equipped with LV Power center panel, UPS, certified fiscal meters with GSM communication, air conditioning system, auxiliary equipment and provision for control station.
The system allows to optimize the use of fuel and to minimize the environmental impact, recovering the residual heat of the exhaust gases to produce additional energy.
Related projects to Compact substation
eHOUSE: the smart solution for energy distribution
Latin America
We have designed and manufactured n. 5 compact plug-in substations for MV and LV electricity distribution at a territorial level, primarily designed for hotel facilities. The cabins are part of a unified MV distribution system with a double-ring configuration.
eHouse 33kV for BESS – Scotland
Scotland (United Kingdom)
Design, manufacturing and supply of an eHouse 33kV addressed to the Overhill Battery Energy Storage System, in Scotland, UK.
