N. 10 E-Houses 34.5kV for temporary applications

La Havana (Cuba)

Country

Cuba

Year

2021

Description

It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.

We have carried out n. 10 portable e-Houses with the following features:

  • N. 3 portable transformation cabins 100kVA 34.5/0.220/0.127kV
  • N. 5 portable transformation cabins 150kVA 34.5/0.220/0.127kV
  • N. 2 portable transformation cabins 300kVA 34.5/0.220/0.127kV
The cabins are equipped with:
  • MV GIS switchgear ATR-Ring 34.5kV 630A 16kA
  • LV switchboard Euro-SDS
  • Power transformers LV/MV
  • Coils and coil cages

The e-Houses are designed to be easily moved from one plant to another, according to the demand for energy. To ensure safety and quick handling, the plug-in STC-Kiosks are mounted on a draggable self-supporting skid platform and are provided with hooks for lifting. Moreover, they are supplied with unwinder coils and input cable doors for an easy connection to the grid.
These features allow avoiding civil works on-site and saving time for multiple connection operations.
Each cabin is equipped with lighting and power outlet services, and they are supplied wired and tested, ready to connect and include all safety signaling to the people who operate the cabin.

Related projects to Transformation cabin

E-HOUSE 33kV FOR UK BESS PLANT

Newburgh (United Kingdom)

We have designed, constructed, and supplied an eHouse STC-Box for the Battery Energy Storage System (BESS), in the UK.

MV Transformation cabin 30kV for electrical grid

Halat (Lebanon)

The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.