N. 10 E-Houses 34.5kV for temporary applications

La Havana (Cuba)

Description

It is a customized project to provide temporary energy in building sites in Cuban provinces, wherever is needed.

We have carried out n. 10 portable e-Houses with the following features:

  • N. 3 portable transformation cabins 100kVA 34.5/0.220/0.127kV
  • N. 5 portable transformation cabins 150kVA 34.5/0.220/0.127kV
  • N. 2 portable transformation cabins 300kVA 34.5/0.220/0.127kV
The cabins are equipped with:
  • MV GIS switchgear ATR-Ring 34.5kV 630A 16kA
  • LV switchboard Euro-SDS
  • Power transformers LV/MV
  • Coils and coil cages

The e-Houses are designed to be easily moved from one plant to another, according to the demand for energy. To ensure safety and quick handling, the plug-in STC-Kiosks are mounted on a draggable self-supporting skid platform and are provided with hooks for lifting. Moreover, they are supplied with unwinder coils and input cable doors for an easy connection to the grid.
These features allow avoiding civil works on-site and saving time for multiple connection operations.
Each cabin is equipped with lighting and power outlet services, and they are supplied wired and tested, ready to connect and include all safety signaling to the people who operate the cabin.

Related projects to Transformation cabin

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

N. 4 MV E-Houses 34.5kV for industrial area

Havana (Cuba)

The project was addressed to the developing industrial center of Artemisa and included the engineering study, construction, and commissioning of compact substations for energy distribution and electrical equipment for the substation interconnection.