CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

Country

United Kingdom

Year

2024

Description

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).

This advanced energy facility boasts a capacity of 100MW and 200MWh, representing a significant leap forward in energy management and distribution.
The STC-Box control room is equipped with the following state-of-the-art systems and equipment:

  • HVAC and fire detection systems
  • HV protection panel
  • LV Euro P&C panels
  • Marshalling panel
  • Mimic panel
  • RTU panel and 4G antenna
With these features, our eHouse Control Room supports efficient energy management and ensures the highest levels of safety and reliability.

Related projects to Transformation cabin

N. 2 Transformation cabins for industrial areas

Artemisa (Cuba)

Design, construction, installation of n. 2 STC-Kiosk transformation centers with ring configuration addressed to industrial areas in Cuba.

MV Transformation cabin 34.5/0.48kV for oil plant

Havana (Cuba)

The project has involved the supply and installation of ISO containers 34,5/0,48kV 630kVA, for the oil plant in Havana.