CONTROL ROOM EHOUSE FOR BESS 100MW 200MWh

North Yorkshire (United Kingdom)

Country

United Kingdom

Year

2024

Description

We designed, constructed and supplied an eHouse control room, carried out for Tesla and addressed to the Lakeside Battery Energy Storage System, in Drax, North Yorkshire (UK).

This advanced energy facility boasts a capacity of 100MW and 200MWh, representing a significant leap forward in energy management and distribution.
The STC-Box control room is equipped with the following state-of-the-art systems and equipment:

  • HVAC and fire detection systems
  • HV protection panel
  • LV Euro P&C panels
  • Marshalling panel
  • Mimic panel
  • RTU panel and 4G antenna
With these features, our eHouse Control Room supports efficient energy management and ensures the highest levels of safety and reliability.

Related projects to Transformation cabin

N. 3 MV Transformation cabins 13.8kV for the new boulevard in Varadero

Varadero (Cuba)

The project consists of three transformation cabins addressed to the new Varadero boulevard, in Cuba. It is located in one of the main arteries of the famous Cuban tourist center, where shops and restaurants will be able to carry out their business also thanks to the electricity grid implemented by the C.R. Technology Systems team.

N. 2 Transformation cabin 34.5kV

Jardines del Rey (Cuba)

Design, supply and implementation of the n. 2 compact substations 34,5kV in the Jardines del Rey area, located in Camagüey.