MV Trasnformation cabin 36kV for rural areas
Kinshasa (Congo)
Country
Year
Description
The project has included the installation of a prefabricated compact substation for the electrification of Congolese rural areas.
Design, construction and commissioning of a compact substation 36kV 630A 16kA, made up of a shelter STC-kiosk, low-voltage (LV) switchgears, medium-voltage switchgear ATR and power transformer.
Related projects to Transformation cabin
Electrical equipment for rooftop photovoltaic system 1.8MWP
Artemisa (Cuba)
Our engineers and technicians have studied, designed and assembled electrical equipment addressed to a rooftop photovoltaic system 1.8MWP in an industrial area in Artemisa (Cuba).
N. 2 photovoltaic plants with a total power of 5 MWp
Camagüey, Mayajigua (Cuba)
The project is addressed to n. 2 photovoltaic plants: Camaguey and Mayajigua with a total power of 5 MWp.