MV Transformation cabin 30kV for electrical grid
Halat (Lebanon)
Country
Year
Description
The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.
It has involved the design, implementation and supply of a 40’ ISO marine-type compact substation with a power of 30kV 20kA, which includes a medium-voltage (MV) metal-enclosed ATR switchgear 33kV 1250A 25kA, consisting of n. 6 columns, a low-voltage (LV) switchgear 230V AC for distribution, with IP65 protection, relays, transformers and auxiliary products.
Related projects to Transformation cabin
STC-Skid transformation cabins 4,8MVA
Padua (Italy)
Design, manufacturing and commissioning of plug-in Skid transformation cabins destined for a photovoltaic plant in the beautiful location of Monselice (Padua).
N. 12 Skid transformation cabins for photovoltaic system
Trévago (Spain)
N. 12 transformation cabins STC-Skid 6MVA 30/0,8-0,8kV for a photovoltaic system in Spain.
