MV Transformation cabin 30kV for electrical grid

Halat (Lebanon)

Country

Lebanon

Year

2013

Description

The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.

It has involved the design, implementation and supply of a 40’ ISO marine-type compact substation with a power of 30kV 20kA, which includes a medium-voltage (MV) metal-enclosed ATR switchgear 33kV 1250A 25kA, consisting of n. 6 columns, a low-voltage (LV) switchgear 230V AC for distribution, with IP65 protection, relays, transformers and auxiliary products.

Related projects to Transformation cabin

MV/LV Cement transformation cabin 15/0.8kV for photovoltaic system

Cuneo (Italy)

We have carried out an STC-Kiosk transformation cabin, destined for a photovoltaic system in the province of Cuneo, in Piedmont.

Renewable for Africa – Ivory Coast

Abidjan (Ivory Coast)

The project was carried out thanks to the donation offered to the government of the Ivory Coast, to provide power to a photovoltaic system, used for the extraction and purification of groundwater.