MV Transformation cabin 30kV for electrical grid

Halat (Lebanon)

Country

Lebanon

Year

2013

Description

The project, designed to increase the electricity grid of the Lebanese coast, has been installed in Halat, a municipality located in Jbeil District.

It has involved the design, implementation and supply of a 40’ ISO marine-type compact substation with a power of 30kV 20kA, which includes a medium-voltage (MV) metal-enclosed ATR switchgear 33kV 1250A 25kA, consisting of n. 6 columns, a low-voltage (LV) switchgear 230V AC for distribution, with IP65 protection, relays, transformers and auxiliary products.

Related projects to Transformation cabin

STC-SKID transformation cabins 6MVA et 4MVA

Bucharest (Romania)

Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.

N. 12 Skid transformation cabins for photovoltaic system

Trévago (Spain)

N. 12 transformation cabins STC-Skid 6MVA 30/0,8-0,8kV for a photovoltaic system in Spain.