Lighting system

Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)

Country

Tunisia

Year

2016

Description

The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.

Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.

Related projects

E-HOUSE 33kV FOR UK BESS PLANT

Newburgh (United Kingdom)

We have designed, constructed, and supplied an eHouse STC-Box for the Battery Energy Storage System (BESS), in the UK.

eHouse 33kV for BESS 50MW in Scotland

Pitkevy (Scotland)

E-House equipment for Battery Energy Storage System (BESS) 50MW in Pitkevy, Scotland.