Lighting system
Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)
Country
Year
Description
The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.
Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.
Related projects
HV/MV Mobile Substation 110/20kV 40MVA
Fushë-Krujë (Albania)
Development and supply of a mobile substation 110/20kV for transformation and primary distribution 40MVA, carried out in the geographical area of Fushë-Krujës. It involves the supply of electricity for the benefit of a population of over 40,000 inhabitants.
STC-SKID transformation cabins 6MVA et 4MVA
Bucharest (Romania)
Design, manufactoring and commissioning of n. 3 STC-Skid plug-in substations for a photovoltaic system in Romania.