Lighting system

Capo Bon, Korba, Sbikha, Sbeitla e Feriana di Scogat (Tunisia)

Country

Tunisia

Year

2016

Description

The project has included the dismantling of old lighting fixtures and the installation of more technological lamps, aimed at optimizing the lighting system in the areas of Capo Bon, Korba, Sbikha, Sbeitla and Feriana of Scogat, in Tunisia.

Design, realization and supply of LED lamps 160W 60Hz linked to the junction box located at the base of the pole. Projectors have also been installed on the pole arm. The solution has been provided with plug & play formula.

Related projects

Retrofit of Medium-voltage (MV) circuit-breakers 800A

Dalmine - Bergamo (Italy)

For the realization of the project, the engineering hub has applied a reverse engineering study, starting from the existing plant, to develop an operational and suitable product.

Medium-Voltage (MV) Normal Clad Switchgears 7,2kV 630A 20kA (3s)

Donetsk (Ukraine)

The project has involved the implementation of Normal Clad switchgears, addressed to an important industrial, steel and chemical hub in the city of Donetsk.